The Acea Group’s Consolidated Financial Statements include the financial statements of the Parent Company, Acea, and the financial statements of the Italian and foreign subsidiaries, for which, in accordance with the provisions of IFRS10, there is exposure to the variability of returns and of which a majority of voting rights in the ordinary meetings is held, either directly or indirectly, and consequently the ability to influence the investee returns by exerting management power. Furthermore, the companies on which the Parent Company exercises joint control with other shareholders are consolidated using the equity method.

Compared to 31 December 2021 the following changes occurred in the consolidation scope:

  • on 19 January 2022, the company AE Sun Capital was established, held for 40% by Acea Produzione and 60^ by the investment fund Equitix Investment Management;
  • on 20 January 2022, Acea Solar acquired 100% of the shares of the company SF ISLAND with registered office in Acquapendente (Viterbo, Italy);
  • on 8 February 2022, Acea Ambiente signed the deed of acquisition of 70% of the shares of S.E.R. Plast, a company operating in the recycling of plastic waste;
  • at the end of March 2022, Acea finalised the sale of the photovoltaic holding company (Acea Sun Capital) to the British investment fund Equitix. The agreement for the transfer of assets was signed on 24 December 2021. With the closing of the operation, the newco AE Sun Capital Srl, 60% owned by Equitix and 40% by Acea Produzione, acquired from Acea Produzione the photovoltaic holding company of the Acea Group, the holder, through a number of vehicles, of a portfolio of photovoltaic plants, with a total installed capacity of 105 MW, of which 46 MW incentivised on the basis of different Energy Accounts and 59 MW for new construction already connected or being connected to the network;
  • on 1 April 2022, a purchase agreement was signed by Adistribuzionegas for 30% of Romeo Gas as part of the sale by A2A of concessions for the natural gas distribution service;
  • on 23 May 2022, Acea Ambiente signed the deed of acquisition for an additional 20% of the shares in Cavallari, brining its stake to 80%;
  • on 30 June 2022, the acquisition by Acea Ambiente of the business unit known as Polo Cirsu was signed after participation in the competitive bidding process begun with the notice of sale issued by the Court of Teramo. This business unit consists of: i) a landfill known as “Grasciano1”, completely depleted of authorised volumes; ii) a landfill known as “Grasciano2”, consisting of an first lot of 234,000 m3 and a second lot to be built, with an authorised volume of 246,000 m3; iii) a recycling and composting plant and a platform to utilise separate
    waste;
  • on 29 July 2022 Acea Solar signed for the purchase of 17 vehicle companies in the Basilicata region (Powertis Group), each the holder of development projects for monoaxial ground-mounted photovoltaic plants. The total power is estimated at 338 MWp, with annexed storage systems for 170 MWp of power;
  • on 1 September 2022, Acea Renewable 2 Srl and Fergas Solar 2 Srl were established, both 100% held by Acea Solar to complete the transfer of photovoltaic assets for plants constructed in the industrial and agricultural area. The establishment of the two companies is part of the project to deconsolidate the photovoltaic segment, begun on 22 March 2022, and which calls for a second closing, involving the transfer of plants that will be connected and operating on the date of the transaction;
  • on 1 October 2022, the partial demerger of Romeo Gas SpA was completed, implemented through the assignment of equity shares in favour of Adistribuzionegas Srl. The purpose of the operation is part of an overall corporate reorganisation to achieve more efficient management of gas distribution concessions;
  • on 4 October 2022, Acea Ambiente signed the acquisition of 70% of the capital of Tecnoservizi Srl, a company that offers separate urban waste treatment and recovery services. The company’s authorised capacity is treatment of 210 thousand tonnes per year in the province of Rome, coming from separate waste of Municipalities, entities and businesses;
  • on 3 November 2022, Acea Ambiente, through its subsidiary Cavallari Srl, completed acquisition of 100% of Italmacero Srl, a company operating in the mechanical treatment and recovery of separate urban waste (mixed packaging, monomaterial fractions) and special non-hazardous waste;
  • on 22 November 2022, the reverse merger by incorporation of AE Sun Capital with the subsidiary Acea Sun Capital was complete. The merger is part of an investment project involving the renewable energy sector and was implemented to achieve advantages through unification of processes, structures, achieving synergies and economies of scale, as well as cost efficiencies;
  • on 6 December 2022, the closing of the initial stage of the business combination with ASM Terni was signed, following the completion public procedure initiated by the latter. The operation is intended to create a single operator working in the integrated water cycle, environment and electricity and gas distribution and sales sectors;
  • on 19 December 2022, DropMI Srl was established, which carries out research and engineering for next generation water metres, that can operate and be monitored remotely, and also develops smart water solutions for the domestic and international markets.

Unconsolidated equity investments

Tirana Acque Scarl in liquidation, 40% owned by Acea, is recognised at cost. The subsidiary, entirely written off, is excluded from the consolidation scope as it is not operational and its relevance in qualitative and quantitative terms is not significant.

Accounting standards
and measurement criteria

Share